Civic Trust
  • Home
  • About Us
    • What we do
    • Save the Date
    • Newsletters
  • Featured Articles
  • Heritage & History
    • Heritage NZ Listed Category 1
    • Awards & Grants
  • Blue Plaques
  • Street Art
  • Get involved
    • Become a member
    • Make a donation chasing coin
  • Contact
    • Links
    • Facebook Page
Featured Articles

Timaru Library

25/8/2016

0 Comments

 
The Timaru Library was designed in the Christchurch office of Warren & Mahoney and built by C Lund & Son Ltd in 1977.

The project was a major one for the Council, taking over a whole block and carving out a deep pit to house the Civil Defence hub.  The sculptured form with its curved concrete walls and shapely rooflights has been much admired.

Further, the low profile of the building is respectful of the tall church towers so dominant in this precinct.

However the building has some technical failings.  The textured concrete walls are uninsulated, and combined with the extensive use of standard single glazing in aluminium frames across the entire south face of the building, energy conservation was not high on the agenda.

From the start there were problems with the roof.  A new wood-based sheet material was specified as sarking under the Butynol membrane roofing.  While this boarding was chemically treated to resist decay it was still capable of absorbing large amounts of moisture and thereby losing strength.  The boarding became saturated – not from above but from all of the construction moisture rising from the new concrete work.  The situation appeared to be calamitous, but after some expert advice the situation righted itself.  The new sarking material rapidly disappeared from the market.

The steel roof structure is complicated.  The curved trusses that span across the roof are stabilized by the steel rods that tie the trusses to a major concrete column near the entry, showing in this photograph. The Council was advised to regularly test these Macalloy rods to check that their stress levels remain at the correct tension.  Can such a burden be loaded on the client when the building is a library full of fixed shelving, and columns could have been designed throughout the interior without any loss of amenity.

David McBride
 
Picture
0 Comments



Leave a Reply.

    Back to Articles

    View by date

    Archives

    February 2021
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    October 2018
    September 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    November 2017
    October 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015

    Categories

    All
    Featured Articles

Picture
CONTACT US
PO Box 674 Timaru 7940

Email info@timarucivictrust.co.nz
Picture

© Timaru Civic Trust | Website by Corporate Print
Imagery supplied by Brian High Productions ©
  • Home
  • About Us
    • What we do
    • Save the Date
    • Newsletters
  • Featured Articles
  • Heritage & History
    • Heritage NZ Listed Category 1
    • Awards & Grants
  • Blue Plaques
  • Street Art
  • Get involved
    • Become a member
    • Make a donation chasing coin
  • Contact
    • Links
    • Facebook Page